Poseidon Configuration:
- 5 global-view units (10 cameras) installed at a depth of 1.6m
- Video coverage of the pool: 50%
- Computer-aided Surveillance: deep-end zones
The Poseidon System was installed over a 4-week
period whilst the pool was drained for annual maintenance and became
operational at Wycombe Sports Centre on 21 February 2001. Installation
was carried out without interrupting maintenance activities. The
technical staff at High Wycombe completed the electrical installation
work. Poseidon Technologies conducted the staff training. The official
inauguration of the site was held on 28th March 2001 and enjoyed
extensive media coverage, including Tomorrow's World, BBC, Sky,
National & Regional Press and Radio.
We
believe this technology will be an incredible tool to aid lifeguards
in their dedicated efforts and if it saves just one life, it will
be more than worth it.
Paul Marston Weston, Head of Leisure Services,
Wycombe District Council